Cisco Systems XR 12410 Instrukcja Instalacji Strona 198

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
Przeglądanie stron 197
Chapter 5 Maintaining the Router
Removing and Replacing AC and DC Power Subsystem Components
5-34
Cisco XR 12410 Router Installation Guide
OL-13832-01
Step 8 Reconnect the W DC power cables in the following order (Figure 5-20):
a. Ground cables first.
b. Positive cables next.
c. Negative cable last.
d. Repeat steps a, b, and c for the other PDU.
e. Go to Step 9.
Warning
To prevent injury and damage to the equipment, always attach the ground and
source DC power cable lugs to the power shelf terminals in the following order:
(1)
ground to ground, (2) positive (+) to positive (+), (3) negative (–) to
negative (–).
Przeglądanie stron 197
1 2 ... 193 194 195 196 197 198 199 200 201 202 203 ... 229 230

Komentarze do niniejszej Instrukcji

Brak uwag